Peak Oil News

 

 
Menu
 News
 Search
 Topics
 Stories Archive
 Submit News
 Discussions
 Code of Conduct
 Forums
 Last 24 Hours
 PO 24hrs
 Peak Blog
 Ask Jane
 Resources
 About Us
 Downloads
 Web Links
 PeakWiki
 PeakPortal
 Focus Search
 Peak TV
 Peak Oil Boston
 Follow on Twitter
 Members
 User Panel
 Members List
 PO Team
 JOIN!
 Private Messages
 
PeakSpeak
NICKNAME

Download TeamSpeak
What is PeakSpeak?
Peak Oil on IRC
 
Member Quotes
Abiotic oil debunking is a regular thing around here. New members who have not done their homework bring it up as a solution to the worlds problems. Posting a reply uses more energy than will ever be generated by such a thing.

kpeavey

Suggest Quote

 
Photo Album
Submit Photo
Peakoil.com is You!


member photos
 
Links

Net App Training
Aaron
 
Halliburton to coax more oil out of largely depleted Ghawar field
Production; Extraction; ExplorationHalliburton was awarded a five year integrated turnkey contract for Ghawar field. Work will be performed in Uthmaniyah, Haradh, Hawiyah and Shedgum. Halliburton will provide drilling rigs, directional and horizontal drilling tools, logging, cementing, mud engineering, perforation, completion and well construction services. Halliburton will engineer and manage the entire drilling operation.Three to four rigs will drill and complete between 153 and 185 oil and water injection wells.


Ghawar field, the world's largest, is a long asymmetric structure that is 230 kilometers long and approximately 30 miles wide however the width diminishes going south.The The announcement makes no mention of Ain Dar, the most mature part of Ghawar in the extreme northwestern region of the field. Ain Dar has been under pressure maintenance by peripheral water injection for over 40 years. Ain Dar (and other parts of the field) began producing salt water in the late 1970s and by 2005, the cut was 42%. All of Ain Dar was wet since 1984. Once water became a major problem, many existing vertical wells were converted to short lateral horizontals running along the top 10 feet of the Arab D zone, the main pay. New wells were drilled horizontally to the same layer. Today, the redevelopment process has gone on so long that future oil production from Ain Dar is speculative. Shedgum, adjacent to Ain Dar on the east, is not much better off.

GL Group

Posted on Sunday, November 08 @ 06:07:01 PST by Leanan
 
Related Links
· More about Production; Extraction; Exploration
· News by Leanan


Most read story about Production; Extraction; Exploration:
Does Thermal Depolymerization Solve the Problem of Peak Oil?

 
Article Rating
Average Score: 0
Votes: 0

Please take a second and vote for this article:

Excellent
Very Good
Good
Regular
Bad

 
Options

 Printer Friendly Printer Friendly

 
"Halliburton to coax more oil out of largely depleted Ghawar field" | Login/Create an Account | 0 comments
The comments are owned by the poster. We aren't responsible for their content.

No Comments Allowed for Anonymous, please register